Model NO.
WLD-PS-C3
Heating Mode
Diesel
Paint Mist Treatment
Dry-type
Condition
New
External Size
7500*3550*3480mm
Internal Size
6300*3500*2700mm
Air Speed
>=0.2-0.3m/S
Transport Package
Export Standard
Specification
Standard Type
Trademark
WeiLongDa
Origin
Guangzhou, China
HS Code
84198990
Production Capacity
4, 000 PCS/Year
Type:
Spray Booth
Certification:
CE
Substrate:
Steel
Brand:
Weilongda
Coating:
Powder Coating
Airflow Direction:
Fully Undershot-type
1. CE certificate Approved Preparation station
2. Exhausted air from the basement
3. Real preparation station manufactorer in China
4. 1 year warranty
5. High quality and best service.
![Preparation Station (WLD-PS-C3) Prep Bay](https://image.cautop.com/226f3j00diqTSpglLmke/Preparation-Station-WLD-PS-C3-Prep-Bay.jpg)
![Preparation Station (WLD-PS-C3) Prep Bay](https://image.cautop.com/226f3j00dVbtKHullJqB/Preparation-Station-WLD-PS-C3-Prep-Bay.jpg)
2. Exhausted air from the basement
3. Real preparation station manufactorer in China
4. 1 year warranty
5. High quality and best service.
External Size | 7500× 3550× 3480mm(L× W× H) |
Internal Size | 6300× 3500× 2700mm(L× W× H) |
Plenum Dimension | 6300× 3450× 400mm(L× W× H) |
Basement | 300mm galvanized steel basement, full grilles made by flat bar and round steel then galvanized. 2 ramps, external setting, 2000× 750mm(L× W), surface is powder coating |
Room Body | Back side with 50mm EPS wall panels, the other 3 sides with PVC curtains |
Lighting System | Ceiling lights 8units × 4pcs=32pcs 36W, 800Lux |
Intake and Exhaust System | 5.5KW double intake centrifugal fan for intake air, 5.5KW double intake centrifugal fan for exhaust air, air capacity is 15500 m 3 /h. With manual damper for exhaust air |
Heating System | RIELLO G10 burner, Max. heating productivity: 100000 Kcal/h. Max. Working Temperature 25 o C |
Filtering System | Pre-filter, high efficiency filter, exhaust fiberglass filter |
Control System | Fan operation switch, lighting switch, temperature controller, emergency stop |
Total Power | 12.2 KW |
Generator Setting | Exhaust air from rear side, powder coating treatment |
Setting Style | Suspending steel hook from roof of building or steel column supporting |
![Preparation Station (WLD-PS-C3) Prep Bay](https://image.cautop.com/226f3j00diqTSpglLmke/Preparation-Station-WLD-PS-C3-Prep-Bay.jpg)
![Preparation Station (WLD-PS-C3) Prep Bay](https://image.cautop.com/226f3j00dVbtKHullJqB/Preparation-Station-WLD-PS-C3-Prep-Bay.jpg)
Send Message