Product Description:
PUHUA Group has several dust collection systems that can be adapted to any manufacturer's blast equipment and will effectively and efficiently evacuate dust and debris resulting from the blasting process. These easily maintained, all inclusive systems require little maintenance and typically only require routine cartridge changes. Additionally, we offer dust cartridges to keep customers dust collectors working at peak efficiency.
The condition of the dust collector is critical to proper performance of the separator.
Dust Collectors features & benefits:
1.Effectively and efficiently removes dust from the blast operation and the facility
2.Requires minimal maintenance
3.Several sizes and configurations available
4.Safer for the environment and plant workers
5.Works with any blast equipment regardless of the manufacturer
Typical Technical Parameters:
PARAMETER | Removing dust air volume | Filtration(m2) | Induced draft fan rate(kw) |
HR-4 | 3000 | 80 | 5.5 |
HR-8 | 6000 | 120 | 7.5 |
HR-12 | 9000 | 180 | 11 |
HR-16 | 12000 | 240 | 22 |
HR-24 | 18000 | 360 | 22 |
HR-32 | 24000 | 480 | 30 |
HR-36 | 27000 | 540 | 37 |
HR-40 | 30000 | 600 | 37 |
HR-48 | 38000 | 720 | 37 |
HR-56 | 42000 | 840 | 45 |
HR-64 | 56000 | 860 | 45 |
Blasting operations vary as do facility requirements. To find the proper dust collection system for your blasting operation, we encourage you to contact us for better solution.
Company Information:
Qingdao Puhua company focus on design, research, develop, manufacture and sell sand blast booth, sand processing equipment, painting line,environmental protection equipment, all kinds of shot blasting machine, , includes hook type, crawler belt type, roller type, catenary type, road surface type etc. Products all adopt auto CAD, supplying the best cost performance products for casting, metallurgy, automobile, shipbuilding, construction, mining machinery and engineering machinery. They also can base on users' requirements to design and manufacture various non-standard special casting machinery, provide the designing - manufacturing - debugging - training - services for the integration of turnkey projects.
More products:
FAQ:
1. Production time:
20-40 days according to different type.
2. Installation and commissioning time:
10-15 days.
3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:
12 months from date of commissioning completion.
5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.
Contact Information:Send Message