Model NO.
Customized
Technology
Hot Pressing Molding ,Injection Molding or Extrusi
Hardness
Shorea
Working Temperature
-60 to +350 Degrees Celsius
Density
1.0-2.0
Drawing Format
Dwg/Dxf/Igs/Step/X-T and Pdf
Service
OEM or ODM
Transport Package
Carton Case or Upon Request
Specification
as Per Drawing
Trademark
Baimi
Origin
China
HS Code
8477900000
Production Capacity
50000/Day
After-sales Service:
1year
Warranty:
1year
Item:
Silicone Vibration Damper
Free Samples:
1-5 PCS
MOQ:
1PC
Tolerance:
+/-0.05mm
Low price custom-designed silicone rubber vibration damper
2. Small order acceptable;
3. Free samples;
4. 100% raw material;
5. Variety of material;
6. High precision & high quality control;
7. Competitive prices;
8. Safe packing & prompt delivery
Product Specification:
Lead Time:
Rubber products: 3-7 days after payment
Plastic products: 5-7 days after payment
CNC machined parts: 3-10 days after payment
Product Advantages:
1. Customer's design and logo;2. Small order acceptable;
3. Free samples;
4. 100% raw material;
5. Variety of material;
6. High precision & high quality control;
7. Competitive prices;
8. Safe packing & prompt delivery
Product Specification:
Item | Low price custom-designed silicone rubber vibration damper |
Material | EPDM, NR, Silicon, FKM,IIR,NBR,SBR,Sponge Rubber, or Custom Compound |
Color | Black, white, red, green or according to Pantone code |
Free samples | 1-5 pcs |
MOQ | 1pc |
Size | As per customer's request |
Processing Technic | CNC machining, injection molding & extrusion |
Hardness | Shore A |
Working temperature | -60~350ºC |
Tolerance | ±0.05mm |
Density | 0.9-2.5g/cm³ |
Service | OEM or ODM |
Production basis | Samples or drawings |
Certification | ROHS,FDA,ISO9001:2000 |
Conductivity | Conductive or insulative |
Working life | 1-30 years |
Application | 1.transmission system in areas of industrial equipment 2.medical device, automotive, office equipment, household 3.appliances,digital electronic, toy etc. |
Lead Time:
Rubber products: 3-7 days after payment
Plastic products: 5-7 days after payment
CNC machined parts: 3-10 days after payment
Send Message