Model NO.
OFFBR
Length
5′
Gross Weight
17.5T
Experice
10 Years
Producing Period
<20 Days
Frame Size
10FT
Life Span
<25 Years
Color
Customized
Condition
Brand New
Logo&Color
Client Request
Size
10FT,20FT,40FT,45FT
MOQ
5 PCS
Surface Treatment
Hot DIP Galvanized/Painted
Standard
Dnv 2.7-1&En 12079 Standard
Transport Package
No Package
Specification
15.7CBM
Trademark
Longteng
Origin
Tianjin/Shanghai, China
HS Code
8609009000
Production Capacity
300 Units in One Month
After-sales Service:
Online Technic Support
Warranty:
One Year
Type:
Offshore Container
Certification:
BV,Lr
Volume:
2991*2438*2591mm
Material:
Corten Steel
Sea Cylinder DNV Standard Gas Bottle Rack Offshore Container
types for 12/16/8 cylinders. It could be customized design. DNV sling is available if request. Optional
type: 4 legs/5 legs.
Product Name | DNV2.7-1 Standard 5ft Offshore Container Sea Cylinder Gas Bottle Rack |
Material | JIS SPA-H/ GB Q345D,E36 |
Size | 5ft or customized |
Surface treatment | painted / galvanized with high anti-corrosion performance & compliant with environment protect trend. |
Standard | DNV 2.7-1 EN 12079 Standard |
Design Temperature | -20 °C/-40 °C |
Application | For offshore oil & gas platform, transportation special cargoes, |
External | 1.428 x 1.158 x 2.300m |
Internal | 1.237 x 950 x 1.968m |
Inside Cubic Capacity | 2.31 cbm |
Maximum Gross Weight | 2700 kgs |
Tare Weight | 700 kgs |
Maximum Payload | 200 kgs |
Lifting Angle | 45ºC |
Packing
Non package requirement for gas bottle rack offshore container.Delivery
We can deliver our offshore container to worldwide post.
Q: How can you ensure your quality? Any approval?
A: Our offshore gas bottle rack is designed and fabricated according to DNV 2.7-1 and EN 12079 standard.
It have approval the ISO standard and classification society.
It have approval the ISO standard and classification society.
Q: What about the payment terms?
A: Our payment term is based on your order amount. Usually we accept 40% TT in advance, the balance before shipment.
Q: What about delivery date?
A: This is basis on the quantity you ordered. Usually it takes 45 days to fabricate and approval for CSC certificate.
Send Message