Share Categories Channel

1/6
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator, Railway Machine, Railway Sleeper image 1Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator, Railway Machine, Railway Sleeper image 2Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator, Railway Machine, Railway Sleeper image 3Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator, Railway Machine, Railway Sleeper image 4Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator, Railway Machine, Railway Sleeper image 5Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator, Railway Machine, Railway Sleeper image 6

Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator, Railway Machine, Railway Sleeper

Quanzhou Jingli Engineering & Machinery Co., Ltd.

Price $45000.00 / Piece
Mini Order
-+Subtotal: $45000
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

Model NO.
JG80L
Gauge Base
2600mm
Track Gauge
1570mm
Width of Crawler
400mm
Ground Clearance of Counterweight
780mm
Min Ground Clearance
280mm
MOQ
1set
Feature
Mature Technology
Transport Package
Nude Packing
Specification
6100*2800*2650mm
Trademark
JingGong
Origin
China
HS Code
8479109000
Production Capacity
3000 Units/ Year
After-sales Service:
Yes
Warranty:
1 Year
Customized:
Customized
Certification:
ISO9001
Type:
Sleeper
(Length*Width*Height) Travel Position:
6100*2800*2650mm
A track renewal train has a series of machinery units that are combined together into one train. As the track renewal train moves forward, the track renewal process will be done stage by stage to the completion of track renewal as it leaves the area. The first stage of track renewal is the removal of old sleepers.
Don't hesitate to contact us for your custom made offer for lastest new construction equipment or machinery.
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
 
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
This small crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.
The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 
Its grab can be customized according to the actual width of customer's local sleepers.
SPECIFICATIONS
RANGE OF OPERATIONBoom length3300mm
Arm length1850mm
Maimum digging force45KN
Back-end radius of gyration1800mm
Max. Opening Width of Grab650mm
Min. Opening Width of Grab200mm
Max. Radius Grabing Weight0.5~0.6t
Max,Width of Grab2800mm(customizable)
Grapple rotation angle360°
DIMENSION(Length*width*height) travel position6100*2800*2650mm
Gauge base2600mm
Track Gauge1570mm
Width Of Crawler400mm
Ground clearance of counterweight780mm
Min ground clearance280mm
TECHNICAL PARAMETERSApplicable railway gauge1435mm(customizable)
efficiency≥40pic/h
Angle of rotation360°
Machine weight8000kg
Engine modelYUCHAI
Rated Power48KW
Rated Speed2200r/min
Hydraulic system working pressure21Mpa
Hydraulic system flow120L/min
Metering gear pump2*28ml/r
Max Hauling force45KN
(High speed/low speed)4.5/2.5km/h
Grade Climbing ability70%/35°
Volume Of Bucket0.25m3
Revolution Overdrive Pressure16Mpa
Full circle swinging time5.5s
Fqt Fuel Quantity≥4L/h
Capacity Of The Fuel Tank110L
Hydraulic Tank Capacity110L
           
    
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator
Railroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway ExcavatorRailroad Ballast Tamper Tamping Rail Sleeper Changer Machine Replacing Ties Railway Excavator


 












 

Send Message

Content*

Your Name

Tel*

Email*