Share Categories Channel

1/6
Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement, Sleeper Change, Sleeper Replacement image 1Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement, Sleeper Change, Sleeper Replacement image 2Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement, Sleeper Change, Sleeper Replacement image 3Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement, Sleeper Change, Sleeper Replacement image 4Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement, Sleeper Change, Sleeper Replacement image 5Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement, Sleeper Change, Sleeper Replacement image 6

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement, Sleeper Change, Sleeper Replacement

Quanzhou Jingli Engineering & Machinery Co., Ltd.

Price $64800.00 / Pieces
Mini Order
-+Subtotal: $64800
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

Model NO.
JG-LT
Gauge Base
2750mm
Track Gauge
1620mm
Width of Crawler
500mm
Ground Clearance of Counterweight
940mm
Min Ground Clearance
420mm
MOQ
1set
Transport Package
Nude Packing
Specification
7500*2800*2920mm
Trademark
JingGong
Origin
China
HS Code
8479109000
Production Capacity
3000 Units/ Year
After-sales Service:
Yes
Warranty:
1 Year
Customized:
Customized
Certification:
ISO9001
Type:
Sleeper
(Length*Width*Height) Travel Position:
7500*2800*2920mm
JG-LT Rail Machine Sleeper Layer Changer Excavator
 
                 This crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing
                 machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.
                 The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 
                 Its grab can be customized according to the actual width of customer's local sleepers.
Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change ReplacementRailroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
SPECIFICATIONS
RANGE OF OPERATIONBoom length3300mm
Arm length1850mm
Maimum digging force45KN
Back-end radius of gyration1800mm
Max. Opening Width of Grab650mm
Min. Opening Width of Grab200mm
Max. RADIUS Grabing Weight0.5~0.6t
Max,Width of Grab2800mm(customizable)
Grapple rotation angle360°
DIMENSION(Length*width*height) travel position7500*2800*2920mm
Axle base2750mm
Track Gauge1620mm
Width Of Crawler500mm
Ground clearance of counterweight940mm
Min ground clearance420mm
TECHNICAL PARAMETERSApplicable railway gauge1435mm(customizable)
 efficiency≥40pic/h
Angle of rotation360°
Machine weight8000kg
Engine modelYUCHAI
Rated Power48KW
Rated Speed2200r/min
Hydraulic system working pressure21Mpa
Hydraulic system flow120L/min
Metering gear pump2*28ml/r
Max Hauling force45KN
(High speed/low speed)4.5/2.5km/h
Grade Climbing ability70%/35°
Volume Of Bucket0.25m3
Revolution Overdrive Pressure16Mpa
Full circle swinging time5.5s
Fqt Fuel Quantity ≥4L/h
Capacity Of The Fuel Tank110L
Hydraulic Tank Capacity 110L

Company

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement

Optional Device

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement

Workshop

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
Process
Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
Exhibition Show

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement
Certificates

Railroad Track System and Infrastructure Products Jg Equipment Railway Sleeper Change Replacement


 

Send Message

Content*

Your Name

Tel*

Email*