Share Categories Channel

1/6
AAR or Uic Standard Side Frame for Railway Wagon Bolster, Railway Part, Railway Wagon image 1AAR or Uic Standard Side Frame for Railway Wagon Bolster, Railway Part, Railway Wagon image 2AAR or Uic Standard Side Frame for Railway Wagon Bolster, Railway Part, Railway Wagon image 3AAR or Uic Standard Side Frame for Railway Wagon Bolster, Railway Part, Railway Wagon image 4AAR or Uic Standard Side Frame for Railway Wagon Bolster, Railway Part, Railway Wagon image 5AAR or Uic Standard Side Frame for Railway Wagon Bolster, Railway Part, Railway Wagon image 6

AAR or Uic Standard Side Frame for Railway Wagon Bolster, Railway Part, Railway Wagon

QINGDAO GUARDX IMP & EXP CO., LTD.

Price $1000.00 / Sets
Mini Order
-+Subtotal: $100000
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

Model NO.
1750
Transport Package
Export Package
Specification
18-100
Trademark
Guardx
Origin
China
HS Code
8607990000
Production Capacity
500000/PCS
Customized:
Customized
Certification:
ISO14001, ISO/TS16949, ISO9001
Type:
Train Wagon

Our Certifications and Features :
1.American "AAR" Certification;

2.Russian Certification;

3.Ukrainen Certification;

4. German "V" modeling technology;

Side frame - one of the main structural elements of the bogie framework of the model 18-100. It is manufactured by casting, with additional machining and riveting of wear-resistant plates. Side frame, drawing No.100.00.002-4SB, represents a major piece of a freight wagon bogie, which transmits the load on the axle through the axle box. Cast alloy steels 20GFL and 20GL.

Bolster drawing No.100.00.001-6 serves as a bridge between the two side frames in the construction of a freight wagon bogie.To ensure reliability and durability the bolster is casted from steel 20GFL or 20GL.One of the main frame details of a bogies framework model No.18-100. Set lifetime of a bogie frame before a bolster discarding is 30 years. The designated lifetime up to the first depot repair is 2 years, before the first overhaul is 8 years. Established time to failure is at least 2 years.

Overall dimension:

side frame:2.41m*680cm*56cm weight:400kg

bolster:2.61m*39.5cm*47cm weight:525kg
 

Forging Part

Train wagon bogie

 

Material

ER6,ER7,ER8,ER9,R7T,R8T,R9T,CL60

Dimension

According to your drawings

Application

Heavy industrial equipment

Inspection

Chemical composition; UT,MT; mechanical property; dimension check

Standard

IRS,BS,UIC,AAR,BN,GB,TB/T,EN

QC Doc

Chemical composition report mechanical properties report; UT test report; heat treatment report; dimensions check report.

Forging Processing

Ingot---forging---heat-treatment---rough machining---UT.MT---Q+T---inspection---finishing machining---UT.MT---packing

Heat Treatment

Normalized / Annealed / Quenched / tempered

AAR or Uic Standard Side Frame for Railway Wagon Bolster
AAR or Uic Standard Side Frame for Railway Wagon Bolster
AAR or Uic Standard Side Frame for Railway Wagon Bolster
AAR or Uic Standard Side Frame for Railway Wagon Bolster
AAR or Uic Standard Side Frame for Railway Wagon Bolster
 

Send Message

Content*

Your Name

Tel*

Email*