Model NO.
CLW5YF68E
Payload
3tons,4tons,5tons
Fuel
Diesel
Drive Wheel
4×2
Brand
Dongfeng
Models
Small
Usage
Hang Barrel Type
Condition
New
Tank Capacity
5000 Liters
Material
Carbon Steel
Body Thickness
4mm
Wheel Base
3308 mm
Engine
Diesel, 117 HP
Tire
7.50r16 8pr
Side Load Bucket
1 Unit
1 Unit Bucket Loading Time
7 Seconds
Garbage Compact Ratio
1/3 - 1/4
User Manual
Yes
Operating Video
Yes
Logo
as Per Customer′s Request
Transport Package
Naked, Waxed, Bulk Ship, RO-RO
Specification
5890x2100x2350mm
Trademark
CLW
Origin
Suizhou, China
HS Code
8705909090
Production Capacity
500 Unit/Month
After-sales Service:
Engine; Gear Box; Driving Axle etc.
Warranty:
One Year
Certification:
ISO9000, CCC, TS16949, CE
Volume:
3001-6000L
Emission Standard:
Euro3,Euro4,Euro5
Transmission Type:
Manual
Hanging Bucket Side Load Garbage Truck
Product Description
*Famous chassis,stable quality
*Wheel base:3300mm/3308mm
*Capacity of truck:5m3
*hydraulic cylinder at the rear of the hanging bucket garbage truck
*Side with hanging bucket lifting mechanism, can lift 240 liters square trash bin or round trash bin
Specifications of 5CBM Side Loading Garbage truck
Dongfeng 8CBM Side Loading Garbage Compactor Truck | |||||
Overall Dimension | 5890×2100×2350 mm | Gross Vehicle Weight | 4495 kg | ||
Curb Weight | 2750 kg | Loading Weight | 1745 kg | ||
Wheel Base | 3308 mm | Front / Rear Axle | 1800 kg / 2695 kg | ||
Cabin | Left Hand Driving, 2 Passengers Allowed, with Air Conditioner, Radio, | ||||
Engine | chaochai | ||||
Engine horsepower | 117HP, EURO5 | ||||
Max Driving Speed | 80 km/h | ||||
Gear Box | 5 Forward Gear, 1 Reverse Gear, | ||||
Tire | 7.50R16 8PR (6 pieces with one spare) | ||||
Garbage Bin | Capacity | 5CBM | |||
Material | 4mm Carbon Steel for Garbage Bin Body | ||||
Design | Whole unit with Leakage Proof Design | ||||
Ways of Loading | Side Bucket Lifting System | ||||
Garbage Compact Ratio | 1/3 - 1/4 | ||||
Control System | One control Panel on the back, One Control system in back of Cabin | ||||
Dispensing System | 1. Equipped with air-tight dustbin, hydraulic system and operating system. | ||||
2. Automatic loading, compressing and discharging, all handled by 1 person | |||||
3. Sewage water collection tank to avoid any pollution during handling. | |||||
4. Large Pressure, Good Leakage Proof, Convenient Operation | |||||
Dependable Security | |||||
5. Electrical Control Panel for compacting system. | |||||
6. Cycling time<14~18s | |||||
Remarks | 1. Color is optional | ||||
2. Customized LOGO painting as per customer request |
Some reference photos:
Working Diagram
Working Show
Factory Overview
Overseas Exhibition and Local Support
Send Message