SFT100C1(T6013-6
Video Outgoing-Inspection
1year
CE, ISO9001
New
>250m
>10t
Jack-Up
Fixed
Top-Slewing Crane
Construction
6ton
1822 Kn.M
39.5m
5.85/6m
Jiangsu, China
Cruking
Top Brand
Top Brand
Top Brand
Tower crane
Nude Packing
SYT80A(T6010-6)
Jiangsu, China
8705109100
Product Description
Products Description
More excellent performance
• The optimizing layout of the machine makes the stress of the main bearing carriers more reasonable, and the lifting performance is higher than the products with the same tonnage.
• Apply the mature jib technique which integrates plug-in boom head, embedded boom block, and special telescoping mechanism,which makes the jib more stable and reliable.
• Optimize the stress design. Adopt the box-type outriggers which have larger span, stronger rigidity, and better stability.
More reliable quality
• Adopt the classic K series jib telescoping technique, working safer and more reliable.
• Make the most complete safety device system in the industry, ensuring the lifting safer and more reliable.
• The comprehensively upgraded brake system adopts double circuit air pressure design. Multiple systems ensure the brake safety of the truck during travel.
• The intensity and rigidity of the rotary table and frame structure with high rigidity are completely coordinated.
• The perfect integration of the design and structure realizes the automation of welding, which is more reliable.
Easier to maintain
• The optimizing design of the pipeline traces makes the layout more scientific and reasonable, greatly reducing the dismantling and installing time of the pipelines and the maintenance expense.
• Completely upgrade the electrical system. Adopt anti-creep connector clips, greatly prolonging the service life of the parts.
• The optimizing layout of the machine makes the stress of the main bearing carriers more reasonable, and the lifting performance is higher than the products with the same tonnage.
• Apply the mature jib technique which integrates plug-in boom head, embedded boom block, and special telescoping mechanism,which makes the jib more stable and reliable.
• Optimize the stress design. Adopt the box-type outriggers which have larger span, stronger rigidity, and better stability.
More reliable quality
• Adopt the classic K series jib telescoping technique, working safer and more reliable.
• Make the most complete safety device system in the industry, ensuring the lifting safer and more reliable.
• The comprehensively upgraded brake system adopts double circuit air pressure design. Multiple systems ensure the brake safety of the truck during travel.
• The intensity and rigidity of the rotary table and frame structure with high rigidity are completely coordinated.
• The perfect integration of the design and structure realizes the automation of welding, which is more reliable.
Easier to maintain
• The optimizing design of the pipeline traces makes the layout more scientific and reasonable, greatly reducing the dismantling and installing time of the pipelines and the maintenance expense.
• Completely upgrade the electrical system. Adopt anti-creep connector clips, greatly prolonging the service life of the parts.
• Adopt K series rope anti-disorder technique, improving the lifting efficiency, reducing the labor intensity, and prolonging the service life of the steel rope.
• The telescoping steel wire rope oriented and protective device avoids the steel wire rope out of the track and broken.
More energy-efficient and environmental friendly
• Adopt double industrial automation control engine, featuring strong power and energy efficiency.
• Under the economical mode, it can meet the engine power requirement of the normal lifting work. Under the high power mode, it can meet the requirement of the high challenge and high efficient lifting work.
• Adopt the advanced matching technique, which makes the design more scientific. It can reduce the consumption of the mechanism, prolong the service life of the machine, and has high residual value.
• The telescoping steel wire rope oriented and protective device avoids the steel wire rope out of the track and broken.
More energy-efficient and environmental friendly
• Adopt double industrial automation control engine, featuring strong power and energy efficiency.
• Under the economical mode, it can meet the engine power requirement of the normal lifting work. Under the high power mode, it can meet the requirement of the high challenge and high efficient lifting work.
• Adopt the advanced matching technique, which makes the design more scientific. It can reduce the consumption of the mechanism, prolong the service life of the machine, and has high residual value.
Product Paramenters
Max Lifting Capacity | 6T |
Max Lifting Moment | 80t·m |
Free Standing Height | 39.5m |
Max Jib Length | 60m |
The Max Height under Hook | 224.1m |
Tip Load at Max Jib Length | 1t |
The Speed of Slewing Mechanism | 0~0.7r/min |
The Speed of Hoisting Mechanis | 0~80m/min |
The Speed of Trolleying Mechan | 0~55m/min |
The Power of Slewing Mechanism | 7.5kW |
The Power of Hoisting Mechanis | 25kW |
The Power of Trolleying Mechani | 4kW |
Power Voltage | 380V(±10%)V |
Power Frequency | 50Hz |
Details Image