CLW5250GFWD3
Semi-Trailer
40t
7000-8000mm
1820mm
Heavy Duty
Mechanical Suspension
Circle
2
8
Not Self-dumping
ABS Anti-lock Braking System
Steel
New
40 Cbm
Fuel Tank Trailer
CLW
Nude
10190x2500x3650
China
8503009090
Product Description
The advantage of 2 Axles 40M3 Carbon Steel Fuel Tank Trailer
1.High transport efficiency, ensuring the products will not be deteriorated in the process of transportation.
2.Rational structure, safe and comfortable driving cab design.
3.Reasonable design, advanced technology, safety and reliability, energy saving and
environmental protection.
4.Axles are Chinese brand FUWA
5.Secure connection and high safety
The specification of2 Axle40m³CarbonSteel Fuel Tank Trailer
Description | Fuel tank trailer | ||
Vehicle Main Dimensions | Dimensions(L x W x H)mm | 10190x2500x3650 | |
Wheel base (mm) | 5700+1310 | ||
Overhang (front/rear) (mm) | -/1680 | ||
Approach/Departure angle(°) | -/18 | ||
Weight in KGS | Curb Weight | 5500 | |
GVW. | 35000 | ||
Max. driving speed(km/h) | 75 | ||
Tank Body | |||
Shape | Mono block cylinder | ||
Material | 5mmcarbonsteel | ||
End plate | 6mmcarbonsteel | ||
Lifting Ladder | Including top walkway and backside steel material | ||
Bottom valve | 2 sets of API pneumatic bottom valve | ||
Discharging valve | 2set 100mm discharging valves | ||
Compartment | 1or 2/3 as custom need | ||
Discharging pipe | 4 rubber hose,2 pc,6m long | ||
Manhole cover | Steel manhole cover,500mm,2sets with 2breather valves | ||
Chassis | |||
Main beams | Special design 1 beam, connected by bolts and nuts with tanker body. Removed from tank body for separate transportation | ||
Axle | 2 axles | ||
FUWA 13Ton | |||
Landing gear | JOST brand two-speed, manual operating, heavy duty landing gear | ||
King pin | JOST brand 2" bolt-in king pin | ||
Suspension | German design heavy duty mechanical suspension | ||
Pneumatic Braking system | WABCO RE 6 relay valve. T30/30+T30 Spring brake chamber | ||
Wheel rim | 10R22.5 11.00R20with one spare tire,9pieces | ||
Painting | Complete chassis sand blasting to clean rust .1cost of anti-corrosive prime.2 coats of final paint | ||
Accessories | One standard tool box |