TE-1562
Offered
Offered
Tool Rack, Beverage, Clothing, Tools, Food, Industrial, Warehouse Rack
Steel
Layer Frame
Stacking Rack
Mobile
Less Then 2000mm
500-2000kgs
Semi-closed
Conventional
Common Use
Heavy Duty Metal 3 Storage Stacking Racks
Stacking Rack
Galvanized /Powder Coated/Paint
50PCS
20days
Follow Your Drawing
CE/ISO
Accept
100% Free
Topeasy
Bulk Packing
customized
China
7308900000
Product Description

Stacking racks can be stacked 3 to 6 layers on each other to form a three-dimensional storage mode without the need for equipment such as shelves, storage cages and pallets.
It is suitable for use in rental warehouses, low old-fashioned warehouses or workshop temporary storage areas that are not suitable for investment shelves. Features: convenient and reliable, can be stacked together when not in use, saving space.
Material | hight quality cold rolled steel | ||
Surface treatment | static powder coating | ||
Length | 1000 - 2200 mm | ||
Width | 1000 - 1500 mm | ||
Hight | 1200-1500mm | ||
Loading capacity | 100 - 1000 kg | ||
Stacking | 3 or 4 layers | ||
Custom | Yes! color,size,as your request | ||










Business Scope of Topeasy Industry:
| Light duty rack | Selective pallet racking | VNA Pallet Racking | Wire mesh panel | ||||
| Modular wire shelving | Double-deep pallet racking | Mezzanine Rack | Wire mesh container | ||||
| Slotted angle shelving | Drive In pallet racking | Steel platform | Steel pallet | ||||
| Boltless rivet shelving | Radio shuttle racking | Mobile shelving | Storage cage | ||||
| Longspan shelving | Cantilever racking | Stacking rack | Steel pallet box | ||||
| Tyre storage rack | Flow rack | Plastic pallet | Turnover box |

| Q1 | What's your trading terms? |
| (1) | Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading.L/C O/A also available. |
| (2) | Lead time: normally in 15-25 days after deposit received. |
| (3) | Sample policy: samples are always available for each model. Samples can be ready in 7-15 days once payment received. |
| (4) | Shipping port: Qingdao, China. |
| (5) | Discounts: we offer good discount for large quantity. |
| Q2 | How can I deliver my goods? |
| (1) | Sea freight: we will update sea freight once we know your sea port where goods will be delivered. |
| (2) | Agent designated by client: please tell us the contact detail of your shipping agent and we will arrange to deliver the items. |
| Q3 | What is your service? |
| (1) | Your inquiry related to our products or price will be replied in 12 hours. |
| (2) | Well-trained and experienced staffs to answer all your inquiries in fluent English. |
| (3) | OEM & ODM, any your customized racking we can help you to design product. |
| (4) | We have very experienced professional engineers to make best solutions. |
| Q4 | What's the international trading process? |
| A: | Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping |
| Q5 | Does Topeasy Industry have MOQ (minimum order quantity) limitation? |
| A: | No, but good quantity comes with good price.We recommend the order quantity for |

















