Share Categories Channel
1/5
Manufacture Supply 2.25-17, 2.75-18, 2.50-17, 2.75-18 Motorcycle Tyre, Scooter Tyre 3.25-16 3.25-18 110/90-16, Motorcycle Tyre 90/90-10 100/90-10 image 1

Manufacture Supply 2.25-17, 2.75-18, 2.50-17, 2.75-18 Motorcycle Tyre, Scooter Tyre 3.25-16 3.25-18 110/90-16, Motorcycle Tyre 90/90-10 100/90-10

CHINA GREENSKY GROUP CO., LIMITED

Price $10.00 / Pieces
Mini Order
-+Subtotal: $5000
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

Type
Tubeless
Diameter
8
Tire Design
Diagonal Tire
Certification
ISO, CCC, DOT, GS, CE, RoHS, FCC, Sancop Gso
Tread Pattern
Highway Tread Pattern
Kind
Tt
Tire Hierarchy
4pr/6pr/8pr
Customized
Non-Customized
Cord Material
Nylon
Condition
New
Tyre
4/6/8pr
Trademark
GREENSKY
Transport Package
Wrapped by Plastic
Specification
40-50% Rubber
Origin
China
HS Code
4011500000

Motorcycle Tyre,Scooter Tyre

Pattern Code:GS-B038

Circumferential pattern design ,well oriented and drainage good, low noise.

Transverse pattern design makes good driving and braking, very stable when running.

Diamond pattern design at shoulder improve handling when turning.

Enhanced sidewall design to make it safer and has better handling .

SIZE
TYPE
P.R.
2.25-14
T/T
4/6/8
2.50-14
T/T
4/6/8
2.75-14
T/T
4/6/8


Popular model No. in our factory: 

TT Tire

2.25-143.75-193.00-84.00-10
2.25-164.10-183.00-104.00-12
2.25-1770/90-143.00-124.00-14
2.25-1880/90-143.00-144.50-12
2.25-1970/90-173.00-164.50-14
2.50-1480/90-173.00-175.00-10
2.50-16 90/90-103.00-185.00-12
2.50-1790/90-173.25-1680/100-14
2.50-1890/90-183.25-1890/90-19
2.75-1090/100-163.50-890/90-21
2.75-14100/90-103.50-10100/80-14
2.75-16110/90-163.50-16100/90-18
2.75-17120/90-103.50-17110/90-17
2.75-18130/90-153.50-18120/80-18
2.75-214.00-83.75-12130/90-18

 

Our Workshop 

FAQ:
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, 
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

 

Send Message

Content*

Your Name

Tel*

Email*

Shop Cart