Tire Hierarchy
20PR
Cord Material
Steel Wire
Inner Tube
Without Inner Tube
Season
All Season Tire
Customized
Non-Customized
Condition
New
Size
188X188X75 Cm
Weight
500
1
17.5r25 20.5r25 23.5r25 26.5r25 29.5r25
2
29.5r29 17.5r25 20.5r25 23.5r25 26.5r25
3
29.5r25 14.00r24 395/95r24 14.00r25 395/95r24
4
17.5r25 445/80r25 16.00r25 445/95r25 20.5r25
5
1800r25 505/95r25 15.5r25 17.5r25 16.00r25
6
23.5r25 26.5r25 29.5r25 29.5r29 35/65r33 20.5r25
7
35/65r33 23.5r25 26.5r25 29.5r25 20.5r25
8
16.00r25 600/65r25 650/65r25 750/65r25 850/65r25
Transport Package
in Bulk/Plastic
Specification
13.00R25 14.00R24 385/95R24 385/95R25 14.00R25
Trademark
ROYO
Origin
China
HS Code
40112090
Production Capacity
1000000PCS/Year
Type:
Tubeless
Diameter:
≥22"
Tire Design:
Radial Tyre
Certification:
DOT, ISO, ECE, CCC, CE
Tread Pattern:
Dual Purpose Tread Pattern
Kind:
Vacuum Tire
![Heavy Duty Truck Tyre 12.00r24 Radial Tyres TBR Mining Truck Tyre](https://image.cautop.com/226f3j00dptTzwPIVHrR/Heavy-Duty-Truck-Tyre-12-00r24-Radial-Tyres-TBR-Mining-Truck-Tyre.jpg)
![Heavy Duty Truck Tyre 12.00r24 Radial Tyres TBR Mining Truck Tyre](https://image.cautop.com/226f3j00jgTQLPFzVIui/Heavy-Duty-Truck-Tyre-12-00r24-Radial-Tyres-TBR-Mining-Truck-Tyre.jpg)
![Heavy Duty Truck Tyre 12.00r24 Radial Tyres TBR Mining Truck Tyre](https://image.cautop.com/226f3j00mzYtEqBaaerd/Heavy-Duty-Truck-Tyre-12-00r24-Radial-Tyres-TBR-Mining-Truck-Tyre.jpg)
![Heavy Duty Truck Tyre 12.00r24 Radial Tyres TBR Mining Truck Tyre](https://image.cautop.com/226f3j00JpfQaBCSneum/Heavy-Duty-Truck-Tyre-12-00r24-Radial-Tyres-TBR-Mining-Truck-Tyre.jpg)
![Heavy Duty Truck Tyre 12.00r24 Radial Tyres TBR Mining Truck Tyre](https://image.cautop.com/226f3j00EzQtgYICUPur/Heavy-Duty-Truck-Tyre-12-00r24-Radial-Tyres-TBR-Mining-Truck-Tyre.jpg)
![Heavy Duty Truck Tyre 12.00r24 Radial Tyres TBR Mining Truck Tyre](https://image.cautop.com/226f3j00TuaEzgHhtLrp/Heavy-Duty-Truck-Tyre-12-00r24-Radial-Tyres-TBR-Mining-Truck-Tyre.jpg)
SIZES | PR | LOAD INDEX | TRA CODE | TOP SPEED (km/h) | Q'TY/40HQ | Order Quantity | Shipment Quantity | RE-MARK |
11.00R20 | 22PR | 22PR(160/156B) | 230 | |||||
12.00R20 | 22PR | 22PR(162/158B) | 204 | |||||
12.00R20 | 22PR | 22PR(162/158B) | 204 | |||||
12.00R24 | IND-5 | ★★★(180A5) | 170 | |||||
L-5S | ★★★(177A5) | 170 | ||||||
★★★(158/155F) | 170 | |||||||
13.00R25 | E3 | ★★★(163B) | ||||||
14.00R20 | MINING | 20 (164/161F) | 120 | |||||
HIGHWAY | 20 (164/161F) | 120 | ||||||
17.5R25 | ☆☆ | 182A2/167B | E-3/L-3 | 10/50 | 90 | |||
20.5R25 | ☆☆ | 193A2/177B | E-3/L-3 | 10/50 | 64 | |||
23.5R25 | ☆☆ | 201A2/185B | E-3/L-3 | 10/50 | 44 | |||
26.5R25 | ☆☆ | 209A2/193B | E-3/L-3 | 10/50 | 34 | |||
26.5R25 | ☆☆ | 209A2/193B | E-3/L-3 | 10/50 | 34 | |||
29.5R25 | ☆☆ | 216A2/200B | E-3/L-3 | 10/50 | 24 | |||
29.5R29 | ☆☆ | 218A2/202B | E-3/L-3 | 10/50 | 20 | |||
17.5R25 | ☆☆ | 182A2/167B | E-3/L-3 | 10/50 | 90 | |||
20.5R25 | ☆☆ | 193A2/177B | E-3/L-3 | 10/50 | 64 | |||
23.5R25 | ☆☆ | 201A2/185B | E-3/L-3 | 10/50 | 44 | |||
26.5R25 | ☆☆ | 209A2/193B | E-3/L-3 | 10/50 | 34 | |||
29.5R25 | ☆☆ | 216A2/200B | E-3/L-3 | 10/50 | 24 | |||
14.00R24 (395/95R24) | ☆☆☆ | 170E | E-2 | 70 | 116 | |||
14.00R25 (395/95R25) | ☆☆☆ | 170E | E-2 | 70 | 116 | |||
16.00R24 (445/95R24) | ☆☆ | 161A8 | G2 | 70 | 80 | |||
17.5R25 (445/80R25) | ☆☆☆ | 170E | E-2 | 70 | 90 | |||
16.00R25 (445/95R25) | ☆☆☆ | 179E | E-2 | 70 | 80 | |||
20.5R25 (525/80R25) | ☆☆☆ | 179E | E-2 | 70 | 64 | |||
1800R25 (505/95R25) | ☆☆☆ | 186E | E-2 | 70 | 44 | |||
15.5R25 | ☆☆ | 176A2/160B | L-2/E-2 | 10/40 | 120 | |||
17.5R25 | ☆☆ | 182A2/167B | L-2/E-2 | 10/40 | 90 | |||
16.00R25 | ☆☆☆ | 179E | E-2 | 70 | 80 | |||
20.5R25 | ☆☆ | 193A2/161B | L-2/E-2 | 10/40 | 64 | |||
23.5R25 | ☆☆ | 201A2/170B | L-2/E-2 | 10/40 | 44 | |||
26.5R25 | ☆☆ | 209A2/193B | L-2/E-2 | 10/40 | 34 | |||
29.5R25 | ☆☆ | 216A2/200B | L-2/E-2 | 10/40 | 24 | |||
23.5R25 | ☆☆ | 185B | E-4 | 50 | 44 | |||
26.5R25 | ☆☆ | 193B | E-4 | 50 | 34 | |||
29.5R25 | ☆☆ | 200B | E-4 | 50 | 22 | |||
29.5R29 | ☆☆ | 202B | E-4 | 50 | 18 | |||
26.5R25 | ☆☆ | 201A2 | L-4 | 10 | 40 | |||
29.5R25 | ☆☆ | 216A2 | L-4 | 10 | 24 | |||
29.5R29 | ☆☆ | 218A2 | L-4 | 10 | 22 | |||
35/65R33 | ☆☆ | 224A2 | L-4 | 10 | 16 | |||
20.5R25 | ☆☆ | 193A2 | L-5 | 10 | 50 | |||
23.5R25 | ☆☆ | 201A2 | L-5 | 10 | 36 | |||
26.5R25 | ☆☆ | 209A2 | L-5 | 10 | 28 | |||
29.5R25 | ☆☆ | 216A2 | L-5 | 10 | 24 | |||
29.5R29 | ☆☆ | 218A2 | L-5 | 10 | 20 | |||
35/65R33 | ☆☆ | 224A2 | L-5 | 10 | 16 | |||
23.5R25 | ☆☆ | 201A2 | L-4 | 10 | 36 | |||
26.5R25 | ☆☆ | 209A2 | L-4 | 10 | 28 | |||
29.5R25 | ☆☆ | 216A2 | L-4 | 10 | 24 | |||
20.5R25 | ☆☆ | 193A2 | L-5 | 10 | 50 | |||
23.5R25 | ☆☆ | 201A2 | L-5 | 10 | 36 | |||
26.5R25 | ☆☆ | 209A2 | L-5 | 10 | 28 | |||
29.5R25 | ☆☆ | 216A2 | L-5 | 10 | 24 | |||
29.5R29 | ☆☆ | 218A2 | L-5 | 10 | 20 | |||
35/65R33 | ☆☆ | 224A2 | L-5 | 10 | 16 | |||
17.5R25 | ☆☆ | 182A2 | L-5s | 10 | 80 | |||
20.5R25 | ☆☆ | 193A2 | L-5s | 10 | 50 | |||
1800R25 | ☆☆ | 204A2 | L-5s | 10 | 40 | |||
23.5R25 | ☆☆ | 201A2 | L-5s | 10 | 36 | |||
26.5R25 | ☆☆ | 209A2 | L-5s | 10 | 28 | |||
29.5R25 | ☆☆ | 216A2 | L-5s | 10 | 20 | |||
29.5R29 | ☆☆ | 218A2 | L-5s | 10 | 20 | |||
35/65R33 | ☆☆ | 224A2 | L-5s | 10 | 16 | |||
16.00R25 | ☆☆ | 177B | L-3/E-3 | 10/50 | 60 | |||
600/65R25 | ☆☆ | 187A2/178B | L-3/E-3 | 10/50 | 40 | |||
650/65R25 | ☆☆ | 193A2/180B | L-3/E-3 | 10/50 | 30 | |||
750/65R25 | ☆☆ | 202A2/180B | L-3/E-3 | 10/50 | 20 | |||
850/65R25 | ☆☆ | 207A2/196B | L-3/E-3 | 10/50 | 18 | |||
875/65R29 | ☆☆ | 214A2/203B | L-3/E-3 | 10/50 | 16 | |||
14.00R25 | ☆☆☆ | 168B | E-4 | 50 | 116 | |||
18.00R25 | ☆☆ | 185B | E-4 | 50 | 44 | |||
18.00R33 | ☆☆ | 191B | E-4P | 50 | 36 | |||
21.00R35 | ☆☆ | 201B | E-4T | 50 | 24 | |||
24.00R35 | ☆☆ | 209B | E-4T | 50 | 18 | |||
18.00R25 | ☆☆ | 185B | E-4P | 50 | 44 | |||
18.00R33 | ☆☆ | 191B | E-4P | 50 | 36 | |||
21.00R33 | ☆☆ | 200B | E-4P | 50 | 30 | |||
12.00R24 | ☆☆☆ | 178A5 | IND-4 | 25 | 160 | |||
16.00R25 | ☆☆☆ | 200A5 | IND-4 | 25 | 60 | |||
18.00R25 | ☆☆☆ | 214A5 | IND-4 | 25 | 44 | |||
18.00R33 | ☆☆☆ | 219A5 | IND-4 | 25 | 36 | |||
18.00R33 | ☆☆ | 191B | E-4R | 50 | 36 | |||
21.00R35 | ☆☆ | 201B | E-4R | 50 | 24 | |||
24.00R35 | ☆☆ | 209B | E-4R | 50 | 18 | |||
27.00R49 | ☆☆ | 223B | E-4 | 50 | 12 | |||
30.00R51 | ☆☆ | 230B | E-4 | 50 | 8 | |||
33.00R51 | ☆☆ | 235B | E-4 | 50 | 8 | |||
36.00R51 | ☆☆ | 241B | E-4 | 50 | 6 | |||
40.00R57 | ☆☆ | E-4 | ||||||
27.00R49 | ★★ | TL | E4 | 12 | ||||
30.00R51 | ★★ | TL | E4 | 8 | ||||
33.00R51 | ★★ | TL | E4 | 8 | ||||
37.00R57 | ★★ | TL | E4 | 6 | ||||
42/90R57 | ★★ | TL | E4 | 6 | ||||
40.00R57 | ★★ | TL | E4 | 6 | ||||
46/90R57 | ★★ | TL | E4 | 6 | ||||
50/80R57 | ★★ | TL | E4 | 4 |
A:1.Our equipment is provided by famous brands like VMI, Fischer, KOKUSAI, etc.
2.Our major machines from Germany, steel cord from Italy, natural rubber from Malaysia,engineer team
from Hankook, strictly restrict in every process.
3.Our technical team are cooperating with YOKOHAMA engineers.
4.Our workers have over 10 years of experience. They keep good timing which is essential during tire
production.
2. Q:Why choose our 29.5R25 tire?
A:1.our tire is best in quality------- tire tread are with good design, ribs are strong,
rubber are best selected from Malaysia, we have soft and hard compoundfor your choice, our tires all have quality
warranty.
2.Our tires are strictly controlled by each process, we only sell calss A quality tire.
3.We put efforts on long terms cooperation, first order, we will need your cooperation to do in normal payment terms,we have very flexible payment terms up to 90 days
4.We protect your market and profit, we will put only one client in one area to avoid bad competition.
3. Q: What is our favorable payment term?
A: Payment for long terms cooperation of good reputation partners:
We have sino insurance for our vip clients, we can offer O/A 60 days after we are familiar
with each other.We are looking for partnership for long terms.
- Why choose us:
- Japan technology, German production line
- Best natural rubber from Malaysia and Thailand
- Short delivery time
- Professional service before and after sales
- Any inquiry will be replied in 12 hours
Send Message