Share Categories Channel

1/5
Electric Side Step for Toyota Tundra 2022 2023, Side Step, Running Board image 1Electric Side Step for Toyota Tundra 2022 2023, Side Step, Running Board image 2Electric Side Step for Toyota Tundra 2022 2023, Side Step, Running Board image 3Electric Side Step for Toyota Tundra 2022 2023, Side Step, Running Board image 4

Electric Side Step for Toyota Tundra 2022 2023, Side Step, Running Board

Wenzhou Furee International Trade Co., Ltd.

Price $380.00 / SETs
Mini Order
-+Subtotal: $380
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

Model NO.
FRYH012ST
Transport Package
1 Set in a Box
Specification
standard size
Trademark
FUREE
Origin
Zhejiang
HS Code
8708100000
Production Capacity
10000sets/Month
Warranty:
12 Months
Material:
Aluminum Alloy
OEM:
No
G.W.:
37kg
Installation:
Easy with Installation Instruction
Function:
Electric, Automatic
Product Parameters

 

Car Fitment
For Toyota Tundra
Year
2020-2023
Material
Aluminum Alloy
Product Description

 

Electric Side Step for Toyota Tundra 2022 2023
  • Black powder coated finish
  • Requires drilling during installation
  • Backed by a 5-year warranty
  • Can withstand harsh conditions easily
  • Optional light kit available to increase step visibility in low-light situations
  • Mount kit sold separately
 
Detailed Photos

 

Electric Side Step for Toyota Tundra 2022 2023



 
Packaging & Shipping


Electric Side Step for Toyota Tundra 2022 2023Electric Side Step for Toyota Tundra 2022 2023

Our Advantages

Electric Side Step for Toyota Tundra 2022 2023Electric Side Step for Toyota Tundra 2022 2023

FAQ

Q1: What's the MOQ?
A1: The minimum order quantity of each item is different, if the MOQ doesn't meet your requirements, you please don't hesitate to contact and discuss with us.


Q2: Do you accept customization?
A2: Yes, we can do as your request, you please just provide your sample or design.


Q3. How about your delivery time?
A3: Generally, 5-10 days if the goods are in stock, or it will take about 30 days. The specific delivery time depends.


Q4: What are your Payment terms?
A4: T/T, LC, PayPal, Western Union. The order amount<1000usd, 100="">=1000USD, 30% in advance, balance before shipment.


Q5: What are your terms of delivery?
A5: FOB, CFR, CIF, DDU.


Q6: Is there quality control on all production lines?
A6: Yes, all production lines will be equipped with a QC. 100% inspection before packing, Spot inspection before shipment.

 

Send Message

Content*

Your Name

Tel*

Email*