Share Categories Channel
1/5
Greenpedel 250W Ebike MID Motor Conversion Kit, E Bike Kit, E Bike Conversion Kit image 1

Greenpedel 250W Ebike MID Motor Conversion Kit, E Bike Kit, E Bike Conversion Kit

Changzhou Green Pedel Co., Ltd.

Price $229.00 / Sets
Mini Order
-+Subtotal: $1145
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

Model NO.
GP-TSDZ2
Type
Conversion Kits
Motor
Middle Drive Gear Motor
Controller
Sine Wave Integrated Motor
Sensor
Integrated Torque Sensor
Display
Vlcd5/Xh18 Display
Battery
Li-ion Battery
Brake
Brake Levers
Chain
42t
Max Speed
25km/H
Warranty
2 Years
Trademark
Green Pedel
Transport Package
Carton with Foam
Specification
26*26*25cm
Origin
Changzhou Jiangsu Province
Greenpedel 250w ebike mid motor conversion kit
Motor

36V 250W Mid drive DC motor (TSDZ-2) 

1. Brushless direct hub motor              

2. Rated speed=25KM/h.35Km/h if without speed limit

3. Integrated 36V 15A sine wave controller and torque sensor

4. Load≤200KG

5. With cable for throttle,PAS and 1 to 4 cables

Battery

36V 10Ah/13Ah/14.5Ah lithium-ion battery (Samsung 29E/LG M26/LG3200/Panasonic 2900 18650cell)

All battery including 2A/3A charger and smart BMS.

ControllerInside the controller(sine wave)
 
ThrottleThumb throttle
 
DisplayVLCD5/XH18 LCD display(with USB output),XH18 display with GPS function
 
PASTorque sensor motor,inside the motor
 
BrakingElectric brake levers for cutting power off
 









FAQ:

Q1. What is your terms of packing?

A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.





Service:

1.Warranty:motor is 2 years ,battery is 2 years, other ebike parts is 1 year.

2.OEM &ODM are available as customers demand.

3.We have professional team on ebike parts ,rich working experience engineers and sales .

4.Workers are well trained ,testing every single parts before packing.

5.Sales will reply to you within 24hours .online time is long enough,so easy to contact .

6.After-sales service is fast,we will send replacement parts as long as you send broken parts to check.




Quality control:






Company Information:

     Changzhou Green pedel Co.,Ltd is a professional and scientific enterprise that speciality lies  in researching, producing and selling electric bicycles,electric scooters, K-Shaped cars, Shilly-cars and conversion kits. We ensure the quality of the first-class production equipment and the international standard operating procedures, as well as the professional operating staff. We always uphold the principles of "quality first , integrity first, and reputation first. " In the past 7 years, our customers vary from government to industrial organizations, from distributors to retailers. 

 Address: No.1,Qingyang North Road Changzhou City, Jiangsu.          

Website: http://greenpedel.en.made-in-china.com



Send Message

Content*

Your Name

Tel*

Email*

Shop Cart