Share Categories Channel
1/5
Rolling Stock Rubber to Metal Parts for Traction Bar From China Supplier image 1Rolling Stock Rubber to Metal Parts for Traction Bar From China Supplier image 2

Rolling Stock Rubber to Metal Parts for Traction Bar From China Supplier

Maanshan Kingrail Technology Co., Ltd.

Price $80.00 / Piece
Mini Order
-+Subtotal: $800
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

Traction Bar
1 Year
1 Year
Customized
ISO14001, ISO/TS16949, ISO9001
Bogie
AAR, Uic, En, GOST, Iris, Ksr, BS, JIS,Tb
Train, Railway Wagon, Passenger Car, Locomotive
Forging/Casting Production
Mould-Forging-Machining-Inspection
ISO9001, ISO14001, OHSAS18001,Tsi, AAR
42CrMo, 4140, 50mn, Customized Materials
Polish and Paint
OEM\ODM
Black
Composite,Cast Iron
Kingrail Parts
Wooden Box/Pallet
Forging and Casting
China
8705102300
Product Description
Product Description

 

Kingrail Parts offer rubber bushes with superior durability that realize both safety and a comfortable ride by taking up vertical, longitudinal and lateral vibration/loads.

 

Our rubber bushes mainly applied to Metro and Light Rails. Such as: Light rails in Lzmir Turkey, and Metro in US, France, Germany,UK, etc.

 

Specifications:
Material: steel and rubber
Processing: vulcanization

 

D(mm)
66.67
66.67
71
90
104
110
120
140
160
I(mm)
47.6
47.6
47
70
76.2
79.8
80
110
120
L(mm)
135
135
135
170
185
200
240
248
280
Radial Stiffness(kN/mm)
37
50
70
105
88
72
50
190
190
Radial Load(kN)
20
25
40
63
41.2
52
35
90
118
Torsional Stiffness(kN/°)
<13.7
<13.7
20
62.8
70
88
46
/
/
Torsional Angle(°)
±12
±12
±14
±6
±8
±5
±7
±3
±3
Deflection Stiffness(kN/°)
<15.6
<17.2
24
57.6
70
92
52
/
/
Deflection Angle(°)
±8
±8
±10
±4
±8
±3
±8
±3
±3

 

Features:
1. No mechanical friction; No noise;
2. Simple structure;
3. No need for lubrication and maintenance.
4. Enhancing the ride stability, safety and confort of the vehicles.

Detailed Photos




 

After Sales Service

 

1. OEM and customized service.
2. Full machining, primer coating, surface treatment.
3. Complete material testing process.
4. Quality control
FAQ

 

1. How can I get the quotation?
Please send us information for quote : drawing, material, weight, quantity and request.

2. How long will be taken for sample production ?
Sample: 20-30 days for making mold and sample production . The accurate time depends on your product.

3. Can you accept Mini order ?
Yes . Mini order and trial order can be acceptable .

4. What is your Payment Term ?
Mold cost : 100% TT advanced. Main order: 40% deposit, balance 60% to be paid against the copy of B/L .
Contact us

 

If you have any questions, pls feel free to contact us

Send Message

Content*

Your Name

Tel*

Email*

Shop Cart